TM 5-6675-316-14
(4) Split vertical take-up threading.
(a) Remove center idler brackets.
(b) Mount supply reels on top rails.
(c) Mount take-up reels on bottom rails.
(d) Push stage separation knob down and to the left. Make sure that
view stages separate.
(e)
and lifting from
(f)
drop down.
Remove center accumulator roller by pinching spring-loaded latches
between view stages.
Loosen black plastic knobs on film accumulator cover. Let cover
(g) Thread film leader from supply reel, across view stage, down through
stage separation, over accumulator roller, and directly to take-up reel.
4-32