TM 5-3610-287-24
2-51.
REPAIR LOAD CENTER (CONT)
WARNING
Turn off main power switch before repairing load center.
Failure to do so may result in death or serious injury.
1.
Set MAIN POWER switch to OFF.
2.
Remove screw (1) and circuit breaker cover panel (2).
3.
Remove screws (3) along right side of load center and pull back load
center cover (4).
4.
Tag wires (5).
5.
Remove hex nuts (6) and wires (5).
6.
Remove screws (7) and 12-volt circuit breaker (8).
7.
Install new 12-volt circuit breaker (8) with screws (7).
8.
Install wires (5) with hex nuts (6).
9.
Install load center cover (4) with screws (3).
10.
Install circuit breaker cover panel (2) with screws (l).
11.
Set MAIN POWER switch to ON.
12.
To test operate, connect 12-volt power source to Section and ensure
dome lights operate.
MAIN POWER SWITCH
INITIAL SETUP
Tools
Light machine repair tool kit (appendix B, section III, item 11)
Cross-tip screwdriver
Flat-tip screwdriver
Pipe wrench
Materials/Parts
Main switch, JU323
2-158