TM 5-3610-253-14
Remove lag bolts holding treadle guard to floor.
c.
d. Remove lag bolts holding side braces to floor.
e.
Remove bolts holding paper stitcher to side braces.
f. Remove lag bolts and washers holding paper stitcher to floor.
WARNING
Serious injury to personnel or damage to equipment may occur unless two
or more personnel are used to remove and replace paper stitcher because
of weight and balance.
Remove paper stitcher.
g.
h.
Replace paper stitcher by bolting side braces to stitcher.
i.
Aline side braces over holes in floor and secure with lag bolts.
Install bolts holding paper stitcher to side braces.
j.
k.
Install washers and lag bolts holding paper stitcher to floor.
l.
Secure treadle guard to floor using lag bolts.
m.
Replace bulk wire reel.
n.
Plug in power cord.
3-68