TM 5-6675-323-14
Section IX ORGANIZATIONAL MAINTENANCE
3-20.
L U B R I C A T I O N I N S T R U C T I O N S . This equipment does not require lubrication.
3-21. REPAIR PARTS, SPECIAL TOOLS; TEST, MEASUREMENT, AND DIAGNOSTIC EQUIPMENT
(TMDE); AND SUPPORT EQUIPMENT. T h e s e i t e m s a r e n o t r e q u i r e d a t t h i s l e v e l o f
maintenance.
3-22.
SERVICE UPON RECEIPT.
3-22.1 Checking Unpacked Equipment.
a.
Inspect the equipment for damage incurred during shipment. If the equipment
has been damaged, r e p o r t the damage on DD Form 6, Packing Improvement Report.
b.
Check the equipment against the packing list to see if the shipment is
complete.
Report all discrepancies in accordance with the instructions of DA Pam
738-750.
c.
C h e c k to see whether the equipment has been modified.
ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES.
3-23.
a.
PMCS are designed to keep the equipment in good working condition by
performing certain tests, inspections, and services. The intervals provide you, the
o r g a n i z a t i o n a l t e c h n i c i a n , w i t h t i m e s c h e d u l e s th a t determ i n e when t o perf o r m
specified tasks.
I t e m numbers are assigned in chronological ascending
I t e m number column.
b.
s e q u e n c e r e g a r d l e s s o f i n t e r v a l d e s i g n a t i o n . T h e s e numbers are used for your "TM
N u m b e r " column on DA Form 2404, Equipment Inspection and Maintenance Worksheet, in
recording the results of PMCS.
c.
Interval columns.
T h i s column determines the time period designated to
perform your PMCS.
Item to be inspected and procedures column. This column lists functional
d.
groups and their respective assemblies and subassemblies as shown in the Maintenance
Allocation Chart (Appendix B). The appropriate check or service procedure follows
the specific item to be inspected.
List of tools and materials required for PMCS is as follows:
e.
Item
Quantity
Jeweler's
Screwdriver
(0.25
in.)
1 ea
C r o s s Tip Screwdriver
1 ea
C h a r t Paper
ar
3-222 Change 1