Table 5-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number)-Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
For Readiness
ITEM
IN-
Reporting,
NO.
TER-
Equipment Is
VAL
PROCEDURE
Not Ready/
Available If:
FILM PROCESSOR - Cont
12
W
Service Transport System - Cont
9.
Reinstall all crossover assemblies and covers.
13
M
Service Drying System.
1.
Remove rear panel.
CAUTION
When removing or installing air tubes, ensure that
wire fingers are not damaged.
2.
Remove six front air tubes by pressing each
tube left against the spring-loaded stud and
clearing tube from right side frame hole.
3.
Remove squeegee crossover assembly.
5-35