TM 5-3610-285-14
Table 5-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
For Readiness
IN
Reporting
ITEM
TER-
PROCEDURE
Equipment Is
NO.
VAL
Not Ready/
Available If:
FILM PROCESSOR - Cont
13
M
Service Drying System - Cont
7.
Remove seven rear air tubes.
8.
Clean rollers with sponge soaked in water.
Dry rollers and shafts with cheesecloth.
9.
Clean roller supports at each side of frame
with cheesecloth.
10.
Rinse air tubes with warm water. Air-dry
tubes.
DRYER TRANSPORT PARTS
11.
Reinstall rear air tubes. Do not aline end
slot with guide rod.
12.
Reinstall eight rear transport rollers in
their proper positions and rotate seven
rear air tubes to locked position.
13.
Reinstall front transport rollers in their
proper positions.
5-37