TM 5-6675-328-14
Table 5-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number)-Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
For Readiness
ITEM
IN-
Reporting,
NO.
TER-
Equipment Is
VAL
PROCEDURE
Not Ready/
Available If:
FILM PROCESSOR - Cont
9
B
Service Recirculation and Water Tanks - Cont
CAUTION
Prior to disposal of recirculating fluid, field users
should contact their local environmental coordinator,
or their industrial hygienist for instructions on
disposal of chemicals.
2.
Connect hose to external drain.
3.
Top off water in recirculation tank.
Recirculation
4.
Remove water supply line and drain hose.
tank is not full.
5.
Repeat above steps for storage tank.
5-31