TM 5-3610-285-14
Table 5-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
For Readiness
IN
Reporting
ITEM
TER-
PROCEDURE
Equipment Is
NO.
VAL
Not Ready/
Available If:
FILM PROCESSOR - Cont
14
M
Service Recirculation Filter - Cont
3.
Remove filter housing retaining strap.
4.
Remove retaining nut and washer from cover.
5.
Remove filter housing and 0-ring from cover.
6.
Remove retaining clip. Remove sleeve and
filter together from stud in filter housing.
7.
Remove sleeve from filter. Discard filter.
8.
Clean filter housing with fresh water.
9.
Install sleeve into end of new filter.
10.
Install filter and sleeve onto stud in
filter housing. Secure with retaining clip.
11.
Reinstall 0-ring and filter housing to
cover. Retain with washer and retaining nut.
12.
Reinstall filter housing retaining strap.
13.
Reinstall drain plug into bottom of filter
housing.
14.
Open water supply valve.
15
M
Service Processing Fluid System.
1.
Replace developer filter (paragraph 5-10.1).
Filter clogged.
2.
Service strainers (paragraph 5-10.2).
Strainers
clogged.
5-39