TM 5-6675-328-14
Table 5-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number)-Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
For Readiness
ITEM
IN-
Reporting,
NO.
TER-
Equipment Is
VAL
PROCEDURE
Not Ready/
Available If:
FILM PROCESSOR - Cont
10
D
Inspect Recirculation Pump and Sump Pump.
1.
Turn on processor MAIN DRIVE switch.
2.
Turn on RECIRC PUMP and SUMP PUMP switches.
Recirculation
Recirculation pump should run.
pump does not
run.
5-32