TM 5-6675-328-14
Table 5-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number)-Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
For Readiness
ITEM
IN-
Reporting,
NO.
TER-
Equipment Is
VAL
PROCEDURE
Not Ready/
Available If:
FILM PROCESSOR - Cont
6
B
Water Supply Temperature.
Check thermostat thermometer. Should read
Thermostat
75°F + 2°F.
thermometer
does not read
75°F + 2°F.
7
B
Water Level.
Check water level in recirculation and water
Water level is
tanks for full reading by observing level in
low.
sight gage. Top off tanks with-clean, fresh water.
5-29