TM 5-6675-328-14
Table 5-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number)-Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
For Readiness
ITEM
IN-
Reporting,
NO.
TER-
Equipment Is
VAL
PROCEDURE
Not Ready/
Available If:
FILM PROCESSOR - Cont
3
B
Inspect Replenisher Pump Unit.
Press REPL PUMP switch to MANUAL position.
Replenisher
Observe that REPL PUMP INDICATOR light is on.
pump unit is
Listen for replenisher pump unit operation.
not operating.
Ensure flowmeter balls rise in their tubes.
5-26