TM 5-3610-250-14
INDEX (COnt)
PROCEDURE
PARAGRAPH
Replace Air Conditioner/Heater . . . . . . . . . . . . . . . . . . . . .
1.5.3.8
Replace Air Conditioner Support Bracket . . . . . . . . . . . . . . . . . 1.5.3.9
Replace Ventilation Duct . . . . . . . . . . . . . . . . . . . . . . . . 1.5.3.10
Repair Plumbing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.3.11
Repair Wire Moulding . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.3.12
1.5
.3.1
REPAIR PERSONNEL/CARGO DOOR .
TOOLS:
Tool Kit
SUPPLIES :
Preformed Vinyl Gasket
Adhesive
Chalk
Solvent PD-680
Personnel Door Latch Assembly
Cargo Door Latch Assembly
Wiping Cloth
Motor Oil (30 wt)
Hand Oiler
PERSONNEL DOOR
1.
2.
3.
4.
5.
6.
7*
8.
9.
10.
11.
Remove inside door handle.
Remove cotter pin and pins from center latch arm assembly.
Move latch rods out of way.
Punch pin from latch and pull latch from shaft.
Withdraw shaft and handle from outside.
Inspect all components for wear.
Replace worn parts, the O-ring washer, and sleeve.
Reinstall shaft and handle from outside.
Align latch arm on shaft, and secure with new drift pin.
Align latch rod and attach to latch arms with pins, washers, and new
cotter pin.
Reinstall handle.
1-108