Table 1-6.
DIRECT/GENERAL
TM 5-3610-259-14
SUPPORT TROUBLE SHOOTING (Cont)
MALFUNCTION
TEST OR INSPECTION/PROBABLE CAUSE
CORRECTIVE ACTION
5.
CIRCUIT BREAKER(S) TRIP CONTINUALLY.
Step 1.
Step 2.
Step 3.
Check receptacles for overload.
Reconnect plug-in equipment to different circuits.
Check circuit breakers for evidence of overheating, damage, or sus-
pected failure.
Replace circuit breaker(s).
Unplug all equipment on circuit.
Then plug in equipment until cir-
cuit breaker trips.
Repair grounded or defective plug-in equipment.
1.5.3 MAINTENANCE PROCEDURES.
Direct/General Support Maintenance tasks cover the
tasks authorized for Direct/General Support.
When investigating damage or malfunc-
tions, particular care must be used to be sure that the van body has not been struc-
turally damaged to prevent safe transportation.
INDEX
PROCEDURE
PARAGRAPH
Repair Personnel/Cargo Door . . . . . . . . . . . . . . . . . . . . . . . 1.5.3.1
Replace Personnel/Cargo Door . . . . . . . . . . . . . . . . . . . . . . 1.5.3.2
Replace Cargo Door Latch Assembly . . . . . . . . . . . . . . . . . . . . 1.5.3.3
Replace Personnel/Cargo Door Gasket . . . . . . . . . . . . . . . . . . . 1.5.3.4
Replace Circuit Breaker Box Assembly . . . . . . . . . . . . . . . . . . 1.5.3.5
Repair Floor Covering. . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.3.6
Repair Van Body Skin (Permanent) . . . . . . . . . . . . . . . . . . . . 1.5.3.7
1-107