TM 5-6675-319-14
Table 2-3. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
D - During
A - After
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
M - Monthly
S
- Semiannually
Q - Quarterly
Bl
- Biennially
lTEM
NO.
4
lN-
TER-
VAL
Q
ITEM TO BE INSPECTED
PROCEDURE
FILM/PAPER PROCESSOR SYSTEM - Cont
Service Tanks (Storage and Recycling).
1.
Check thermometer reading for recycling tank as
f o l l o w s :
a.
T u r n r e c y c l i n g d i r e c t i o n a l f l o w v a l v e to
r e c y c l i n g t a n k p o s i t i o n.
b. Disconnect tubing on drain side o f
r e c y c l i n g d i r e c t i o n a l f l o w v a l v e.
NOTE
Water is under pressure in tank. It may
be necessary to place pail at an angle to
a v o i d s p i l l i n g w a t e r .
c .
T u r n r e c y c l i n g d i r e c t i o n a l f l o w v a l v e to
d r a i n p o s i t i o n a n d f i l l p a i l w i t h w a t e r .
d.
Insert thermometer into pail, and read
temperature after thermometer has stabilized.
e.
Reconnect drain hose.
f .
If temperature varies from tank thermometer
reading, proceed to step 3. If correct,
proceed to step 2.
2. Check thermometer reading for storage tank as
f o l l o w s :
a.
D r a i n s p i g o t l i n e i n t o s i n k.
b . O p e n s p i g o t v a l v e a n d f i l l p a i l w i t h w a t er
from tank.
2-71