TM 5-6675-319-14
2-14.
ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES.
a.
PMCS are designed to keep the equipment in good working condition by perfor-
ming certain tests, inspections, and services. The intervals provide you, the
organizational technician, with time schedules that determine when to perform speci -
fied tasks.
b.
Item number column.
Item numbers are assigned in chronological ascending
sequence regardless of interval designation. These numbers are used for your TM
Number column on DA Form 2404, Equipment Inspection and Maintenance Worksheet, in
recording the results of PMCS.
c . I n t e r v a l c o l u m n s .
This column determines the time period designated to
perform your PMCS.
d .
Item to be inspected and procedures column. This column lists functional
groups and their respective assemblies and subassemblies as shown in the Maintenance
Allocation Chart (Appendix B).
The appropriate check or service procedure follows
the specific item to be inspected.
e.
List of tools and materials required for PMCS is as follows:
I t e m
Q u a n t i ty
Bimetallic Thermometer
1 ea
Cross Tip Screwdriver
1 ea
Flat Tip Screwdriver
2 ea
10 in. Adjustable Wrench
1 ea
Thread Sealant (Item 37, Appendix E)
a r
P l a s t i c P a il
1 ea
3/64 in. Hex Head Key Wrench
1 ea
2-66