TM 5-6675-319-14
Table 2-1.
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
D - During
M - Monthly
S
- Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM
NO.
14
15
lN-
TER-
VAL
A
A
ITEM TO BE INSPECTED
PROCEDURE
FILM/PAPER PROCESSOR SYSTEM - Cont
Inspect and Clean Processing System - Cont
6.
Drain wash tank by opening WASH tank drain valve.
7.
Reinstall squeegee assembly and crossovers.
8.
R e i n s t a l l c o v e r s.
9 .
Close WASH tank drain valve after wash tank is
d r a i n e d.
Service Processor Cover.
Open processor cover approximately 2 in. (5.8 cm) to
allow chemical-laden fumes to escape from processing
tanks to prevent corrosion of metal components.
For Readiness
Reporting,
Equipment Is
Not Ready/
Available if:
2-34
(Number) - Hundreds of Hours