TM 5-6675-319-14
Table 2-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S
- Semiannually
A - After
ITEM
NO.
17
18
19
IN-
TER-
VAL
S
M
S
Q - Quarterly
BI
- Biennially
ITEM TO BE INSPECTED
PROCEDURE
FILM/PAPER PROCESSOR SYSTEM - Cont
Inspect Centrifugal Pump Assembly - Cont
2.
Inspect security of mountings on pumps. Tighten
bolts as necessary.
3.
Inspect motor leads for visible damage.
4. Reinstall pump covers and right side panel.
Inspect Flowmeter.
1.
Inspect flowmeter for visible damage.
2.
I n s p e c t f l o w m e t e r f o r v i s i b i l i t y o f g r a d u a t i o n s a nd
obstructions. Clean glass shield with cheesecloth
and glass cleaner.
Inspect Flowmeter and Check Flow Rates_.
NOTE
Flowmeter adjustment reference data must be
g e n e r a t e d a t i n i t i a l s t a r t u p o f t h e p r o c e s s i n g
unit. This data shall be retained and used as
the standard for quarterly adjustment.
1.
Remove left side panel.
CAUTION
Fasten disconnected tubes so that the ends
are higher than the solution levels in the
tank or damage to equipment may occur.
For Readiness
Reporting,
Equipment Is
Not Ready/
Available If:
Motor
leads are
damaged.
Flowmeters
are damaged.
2-37