TM 5-6675-319-14
Table 2-1.
OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S
- Semiannually
A - After
Q - Quarterly
BI
- Biennially
ITEM
NO.
12
D
ITEM TO BE INSPECTED
PROCEDURE
FILM/PAPER PROCESSOR SYSTEM - Cont
Inspect Recycling Pump and Sump Pump - Cont
1.
Turn on RECYCLING PUMP and SUMP PUMP switches.
2 . T u r n r e c y c l i n g d i r e c t i o n a l f l o w v a l v e to
pump position and place sump pump directional
f l o w v a l v e t o r e c y c l i n g p o s i t i o n.
NOTE
Indication of sump pump operation will be
fluid flowing up from sump pump directional
flow valve to the recycling tank.
3.
Check recycling pump and sump pump for operation.
For Readiness
Reporting,
Equipment Is
Not Ready/
Available If:
One or both
pumps fail
to operate.
2-29
I N -
TER-
V A L