TM 5-6675-316-14
fc.
Position controller on shelf leaving room to connect main body cable
and operators control cable.
fd. Connect cable.
fe.
Put operators console on top of sealing machine for stowage until
use.
ff. Raise rear of controller so that plate rests on rear shock mounts
properly.
fg.
Raise front of controller enough to install shock mounts.
fh.
Install shock mounts.
fi.
Lower controller mounting plate onto front shock mounts.
fj.
Install four nuts and washers to mounting plate.
fk. Install socket head cap screw with small plastic harness holding
ground wires and cables to left side of table frame.
fl.
Plug in teletypewriter, DSP-2 controller and drafting table power
cords into electrical outlets.
3-201/(3-202 blank)