TM 5-3610-287-24
2-37.
REPAIR GTO STORAGE CABINET ASSEMBLY (CONT)
1.
Remove magnifier light (1) from mounting bracket (2).
2.
Remove nut (3), lockwasher, flatwasher, hex bolt (4), and mounting
bracket (2).
At rear of GTO storage cabinet , remove rivets (5) from loop strap
3.
fastener (6). Remove strap and buckle assembly (7).
Remove rivets (8) from loop strap fastener (9). Remove strap
4.
assembly (10).
Thread loop strap fastener (9) through new strap assembly (10) and
5.
install with rivets (8).
Thread loop strap fastener (6) through new strap and buckle assembly
6.
(7) and install with rivets (5).
7.
At back of plate storage box, install mounting bracket (2) with hex
bolt (4), flatwasher, lockwasher, and nut (3).
8.
Install magnifier light (1) on mounting bracket (2).
This task covers: a. Removal b.
Installation
INITIAL SETUP
Tools
Shop equipment common no. 1 tool kit (appendix B, section III, item 12)
Pipe wrench
Adjustable wrench
Flat-tip screwdriver
Pliers
Materials/Parts
Faucet assembly, VF-T-0340-00
Close brass nipple, MS51846-20 (2 required)
Personnel Required
Utilities Equipment Repairer 52C10
Equipment Conditions
Water tank drained (TM 5-3610-287-10, para 2-7)
2-96