TM 5-3610-285-14
2-6.2 Initial Adjustments. Daily Checks. and Self Tests.
a. Turn on power panel circuit breaker.
b. Be sure glass frame is in its horizontal position and locked in place.
c. Be sure left- and right-hand latches are locked in place.
d. Press master POWER switch on and verify that fan motors, blower motor and POWER ON pilot lamp are on.
e. Verify vacuum bleed valve for vacuum frame in the up position is closed.
f. Press vacuum pump switch for vacuum frame in the up position.
g. Verify vacuum is created in vacuum frame by observing appropriate vacuum gage.
h. Verify vacuum builds up until needle reaches the green area of the gage (approximately 25 pounds).
2-17