TM 5-3610-257-14
j. List of tools and materials required for PMCS is as follows:
Item
Quantity
Lens Brush
1
Cheesecloth (Item 4, Appendix E)
ar
Detergent (Item 8, Appendix E)
ar
NOTE
If the equipment must be kept in continuous operation, check and service only those items that
can be checked and serviced without disturbing operation. Make the complete checks and
services when the equipment can be shut down.
Table 4-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES
B- Before
W- Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
IN
FOR READINESS
ITEM TER
ITEM TO BE INSPECTED
REPORTING
NO.
VAL
PROCEDURES
EQUIPMENT IS
NOT READY /
AVAILABLE IF:
DIGITAL REFLECTION DENSITOMETER
WARNING
Death or serious injury may occur if power
cord is not unplugged before servicing
densitometer.
1
Q
Inspect.
1.
Check power cord for cuts, cracks, or broken
Power cord
plug.
has cuts,
cracks, or
broken plug.
2.
Check densitometer case for dents, scratches,
Missing or
or damaged condition. Check for missing or
broken knobs
broken knobs or switches.
or switches.
4-10