TM 5-6675-331-14&P
4-8. PMCS. (Cont'd)
(2)
Interval Column. This column determines the time period designated to perform your PMCS.
(3)
Item to Check/Service Column. This column lists functional groups and respective assemblies and
subassemblies as shown in Appendix B, Maintenance Allocation Chart.
(4)
Procedures Column. This column describes procedures necessary to perform check.
(5)
Not Fully Mission Capable if: Column. This column contains criteria used to decide whether or not
equipment is ready and available for use. An entry in this column identifies conditions that make
equipment not ready/available for readiness reporting.
4-4