TM 5-6675-328-14
1-6.2 Preparation for Movement.
a. Inventory equipment and supplies.
b. Inflate shock absorbers.
(1)
Remove all valve caps.
(2)
Connect air hose to valve.
CAUTION
To prevent damage to equipment or air shock during transportation, inflate air shocks correctly. Do not
exceed 90 psi (620 kPa).
(3)
Inflate each mount until top of diaphragm is level as shown.
(4)
Reinstall valve caps.
1-35