TM 5-6675-324-14
Table 3-4. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
(Number) - Hundreds of Hours
AN - Annually
B - Before
W - Weakly
D - During
M - Monthly
S
. Semiannually
BI - Biennially
Q - Quarterly
A - After
ITEM TO BE INSPECTED
lN-
ITEM
TER-
NO.
PROCEDURE
VAL
PLAIN PAPER COPIER - Cont
Se rvice Devel oping Ass embly - Cont
BI
14
14. Remove grip ring and developing assembly gear.
15. Remove ratchet spring and remove spacer roller.
16.
Install new spacer roller and reinstall ratchet
spring.
17. Reinstall developing assembly gear and grip
ring.
18. Slowly lower developing assembly onto its
support while pushing toward rear side plate.
19. Reconnect connectors.
Lower holddown clamps.
20.
21.
Reinstall top right panel.
22. Return platen to home position.
23.
Plug in power cord.
3-15. ORGANIZATIONAL TROUBLESHOOTING PROCEDURES. There are no organizational
troubleshooting procedures assigned for this equipment.
3-16. MAINTENANCE PROCEDURES. There are no organizational maintenance procedures
assigned for this equipment.
Contact your battalion for packing and
3-17. PREPARATION FOR STORAGE OR SHIPMENT.
shipping instructions.
3-97