TM 5-6675-319-14
NOTE
Be sure manual override device is removed before proceeding to next step.
x .
Rotate speed control until desired transport speed is set on indicator.
y .
Set dryer thermostat to desired temperature .
NOTE
Be sure that dryer temperature is stabilized before processing paper.
z .
Reinstall all covers and begin processing paper.
2-6.2 Operating Procedures. The operating procedures for the processor are simple
when preparation for use procedures have been completed.
a.
Process paper as follows:
( 1 ) I n s e r t p a p e r t o b e p r i n t e d i n t o p r o c e s s o r t h r o u g h l e f t s i d e o f f e e d
tray; emulsion side down.
NOTE
B e s u r e t h a t f l o w m e t e r b a l l s r i s e t o s e t t i n g e s t a b l i s h e d d u r i n g i n i t i al
s e t - u p.
(2) Timer bell will ring when additional paper may be fed into processor.
(3) When process is complete, extract print from bin and evaluate results.
NOTE
I f r e s u l t s a r e u n s a t i s f a c t o r y , c h a n g e c o n t r o l s o n e i t h e r t h e c o n t a c t
p r i n t e r o r r e c t i f i e r , a n d p r o c e s s e x p o s u r e f o r n e w p r i n t s .
Repeat paper processing until acceptable print is obtained. It may be
necessary to change types of print paper.
( 4 ) I f p r o c e s s i n g i s c o m p l e t e , a n d a d d i t i o n a l p r o c e s s i n g i s a n t i c i p a t ed
within 12 hours, perform step b.
( 5 ) I f p r o c e s s i n g i s c o m p l e t e , a n d a d d i t i o n a l p r o c e s s i n g i s n o t a n t i c i p a t e d
within 12 hours, or chemicals are contaminated, perform steps b. and c.
2-46