TM 5-6675-318-14
Table 1-4.
ORGANIZATIONAL TROUBLESHOOTING - Cont
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
4.
NO POWER TO EQUIPMENT - Cont
Step 3.
Check circuit breaker output for 120 V ac.
(a) If output voltage is present, proceed to step 4.
(b) If output voltage is not present, refer to direct/general
Step 4.
R e m o v e receptacle and check for 120 V ac input.
( b ) I f n o t p r e s e n t , refer to direct/general support maintenance
for repair or replacement of defective wiring.
MAINTENANCE PROCEDURES.
a. This section contains instructions covering organizational maintenance
functions for the Survey Section.
Personnel required are listed only if the
task requires more than one.
sure that equipment is properly functioning.
INDEX
PROCEDURE
PARAGRAPH
Replace
Fluorescent
Lamp
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1-16.1
Replace
Radio
(RF)
Filter
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1-16.2
Replace
Fluorescent
Lamp
Switch
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1-16.3
Replace
On/Off
Switch.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1-16.4
Replace
Blackout/Dome
Light
Microswitch
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1-16.5
1-52