TM 5-6675-318-14
PREVENTIVE
MAINTENANCE
CHECKS
AND
SERVICES
Table 1-3. ORGANIZATIONAL
(Number) - Hundreds of Hours
AN - Annually
W - Weekly
B - Before
S - Semiannually
M - Monthly
D - During
BI - Biennially
Cl - Quarterly
A - After
ITEM TO BE INSPECTED
lN-
ITEM
TER-
NO.
PROCEDURE
VAL
VAN BODY
Service Air Conditioner/Heater. Refer to TM 5-4120-
M
367-14 for preventive maintenance checks and services.
M
Service Liqhtinq System.
WARNING
Do not open circuit breaker panel or service
until main power is off, and voltage meter con-
firms circuit is not energized. Death may
result from failure to observe these safety
precautions.
1.
switch.
Padlock
safety
switch.
2.
all loose screws, bolts, and clamps.
Tighten
3.
C h e c k which s w i t c h e s , s w i t c h p l a t e o u t l e t s , r e c e p -
4.
tacles, and posts require repair.
1-47
Change 1