TM 5-6675-316-14
(19) Check blackout switches.
(20) Plug in emergency lighting and turn switch to READY.
(21) Fully deflate air shocks until composing machine, split-stage light
table, and drafting and measur ing machine rests on top of air shocks.
1-6.2 Preparation for
Movement.
a. Inventory equipment and supplies.
b.
Install tiedowns in
tiedown sockets.
c. Secure authorized equipment in proper containers or as specified by appro-
.
priate chapters.
d. Secure straps and remove slack from tiedowns.
e. Inflate
shock absorbers.
(1) Remove all valve caps.
1-34