TM 5-6675-315-14
Check blackout switches.
(19)
Check blackout switches.
(20)
Plug in emergency lighting and turn switch to ready.
(21)
Fully deflate air shocks until shredder-bagger rests on top of air shocks.
1-6.2 Preparation for Movement.
a.
Inventory equipment and supplies.
b.
Inflate shock absorbers.
(1)
Remove all valve caps.
CAUTION
To prevent damage to equipment or air shocks during transportation, inflate air shocks correctly.
Do not exceed 90 psi (620 kPa).
(2)
Connect air hose to valve.
(3)
Inflate each mount until top of diaphragm is level as shown.
(4)
Reinstall valve caps.
1-33