TM 5-6675-315-14
Table 2-5. ORGANIZATIONAL TROUBLESHOOTING - Cont
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
7.
PRESSURE ON LAMP (KLP) COMES ON WHEN BALE CHAMBER IS ONLY PARTIALLY FULL -
Cont
Step 4. Check for continuity across contacts 43 and 44 of control relay SS.
If continuity is present, replace relay (paragraph 2-16.10).
Step 5. Check for failure of pressure switch SSP.
(a)
Replace defective switch (paragraph 2-16.20).
(b)
Refer to direct/general support maintenance.
2-70