TM 5-6675-315-14
Table 2-4. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
IN
ITEM
TER-
PROCEDURE
NO.
VAL
SHREDDER-BAGGER
1
S
Service Control Switch Rail - Cont
NOTE
Screws for bottom side panel are mounted through spacer bushings placed
between outside of panel and frame of shredder-bagger. Do not lose these
bushings. They must be reinstalled for bottom side panel to be remounted.
4.
Lift bottom side panel off of support brackets and set panel to one side, away from immediate
work area.
2-46