TM 5-6675-315-14
Table 2-4. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
IN
ITEM
TER-
PROCEDURE
NO.
VAL
SHREDDER-BAGGER
1
S
Service Control Switch Rail - Cont
11. Check that activating levers of limit switches
are clean and free of obstructions.
12. Check that trip dogs are in correct position
and holding bolts are tight. Trip dog A should
be 13.75 in. (34.9 cm) from the ram mounting
plate. Trip dog B should be 18.25 in. (46.35 cm)
from the end of trip dog A. Trip dog C should
be 17.25 in. (43.81 cm) from the end of trip
dog A. Trip dog D should be 17 in. (43.18 cm)
from the end of trip dog A.
13. Reinstall control switch rail cover plate, bottom
front panel, and bottom side panel.
2-50