TM 5-3610-287-24
2-63.
REPAIR INCLINOMETER ASSEMBLY (CONT)
CAUTION
All four corners of Section must be level. When leveling
Section with one or more inoperative inclinometers, use an
independent level on inside Section floor in each corner not
having an accurate inclinometer. Failure to observe this
caution may result in equipment damage.
NOTE
An extra person is required inside Section to observe level
on Section floor while person outside raises or lowers
Adjust leveling jacks until level inside Section indicates that Section
6.
is level. Adjust inclinometer plate (3) to pan (4) until vial (8)
indicates level. Tighten screws (2).
7.
Close inclinometer cover (1)
SEAL
INITIAL SETUP
Tools
Materials/Parts
Seal, 54-0180-3
2-199