TM 5-3610-286-10
2-7.
OPERATING PROCEDURES (CONT)
e. Prepare Inking Assembly (Cent)
(13)
(a)
(b)
(c)
(14)
(a)
no. 3.
(b)
(15)
(a)
(b)
(16)
(a)
oscillator
Install Distributor Roller No. 10 (Steel)
Aline flat sides of spindle ends with slotted journals.
Slide roller spindles into slotted journals.
Push roller forward against distributor roller no. 11.
Install Distributor Roller No. 9 (White)
Insert roller bearings in guide bracket above form roller
Push roller forward against distributor roller no. 10.
Install Rider Roller No. 8
Aline flat sides of spindle ends with slotted journals.
Slide roller spindles into slotted journals.
Install Distributor Roller No. 7 (Blue)
Insert roller bearings into slots above and in front of
roller no. 5.
2-86