TM 5-3610-285-14
Table 5-3. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
IN-
ITEM
TER-
PROCEDURE
NO.
VAL
FILM PROCESSOR
1
S
Adjust Detector Switches.
1.
Remove top cover.
2.
Remove entrance crossover.
3.
Remove detector roller cover.
4.
Push the REPL PUMP switch to AUTO.
5.
Using a thickness gage, make sure gap between
plastic tip(s) and top detector roller is
0.020 in. to 0.025 in. (0.5 mm to 0.6 mm).
This should be done without any film between
rollers.
6.
If you need to change gap(s), turn adjusting
nut(s). Tightening each adjusting nut lowers
each switch shaft toward roller.
5-82