TM 5-3610-285-14
Table 5-3. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
IN
ITEM
TER-
PROCEDURE
NO.
VAL
FILM PROCESSOR - Cont
1
S
Adjust Detector Switches - Cont
7.
Insert a piece of 0.004 in. (0.10 mm) thick
film into detector rollers in several places,
to make sure switches turn on replenisher pump.
8.
Reinstall detector roller.
9.
Reinstall entrance crossover.
10.
Reinstall top cover.
2
S
Adjust Developer Temperature.
1.
Turn on MAIN DRIVE switch.
2.
Set recirculating tank thermostat at 75°F.
NOTE
Allow processor to operate for 20 minutes prior to
checking developer temperature.
CAUTION
Do not use mercury thermometers in processor. If a
mercury thermometer is broken inside the processor,
serious mercury contamination will result. Use a
bimetallic thermometer.
3.
Remove top cover and left access cover. Insert
a bimetallic thermometer between developer rack
and side of tank.
4.
Check developer solution temperature. Developer
temperature should be 68°F to 75°F (20°C to 23.8°C)
(or per manufacturer's specifications for
developer), or developer thermostat must be
adjusted.
5-83
