TM 5-3610-285-14
CAUTION
To prevent flooding and/or damage to sump pump, open only one drain valve at a time.
(8) Open DEV drain valve.
(9) Open FIXER drain valve.
(10) Open WASH drain valve.
(11) When tanks are drained, rinse tanks with warm water.
(12) After racks, squeegee assembly, and crossovers have drained, store racks, squeegee assembly and
crossovers in their appropriate wall racks until tanks are refilled.
(13) Shut DEV, FIXER, and WASH drain valves.
(14) Turn RECIRC PUMP, HEATER, and SUMP PUMP switches OFF.
(15) Turn RECYCLING and WATER SUPPLY valves to OFF positions.
5-6.3 Preparation for Movement.
a.
Perform processor shutdown (paragraph 5-6.2b).
b.
Perform drain processor procedure (paragraph 5-6.2c).
5-56