TM 5-3610-285-14
ac.
Install all crossovers. Make sure they are seated properly.
ad.
Reinstall left access panel.
ae.
Turn on all switches on front panel.
af.
Plug chiller into processor ACCY outlet.
ag.
Set TRANSPORT SPEED control knob to desired setting.
ah.
Manually press interlock switch and observe transport system for proper roller operation.
ai.
Reinstall top cover.
5-50