TM 5-3610-285-14
g.
Item number column. Item numbers are assigned in chronological ascending sequence regardless of interval
designation. These numbers are used for your "TM Number" column on DA Form 2404, Equipment Inspection and
Maintenance Worksheet in recording results of PMCS.
h.
Interval column. This column determines the time period designated to perform your PMCS.
i.
Item to be inspected column. This column lists functional groups and their respective assemblies and
subassemblies as shown in the Maintenance Allocation Chart, (Appendix B). The appropriate check or service procedure
follows the specific item to be inspected.
j.
Equipment is Not Ready/Available If: column. This column indicates the reason or cause why your equipment is
not ready/available to perform its primary mission.
k.
List of tools and materials required for PMCS is as follows:
Item
Quantity
Sponge (Item 55, Appendix E)
3 ea
8 in. Adjustable Wrench
1 ea
Drain Pan, 9 x 9 x 3 in.
1 ea
Cross Tip Screwdriver
1 ea
Recirculation Filter
1 ea
1 in. Combination Wrench
1 ea
3/8 in. Combination Wrench
1 ea
9/16 in. Combination Wrench
1 ea
Rags (Item 47, Appendix E)
1 ea
Cheesecloth (Item 14, Appendix E)
ar
Glass Cleaner (Item 11, Appendix E)
ar
Graduated Cylinder
1 ea
Plastic Tubing, 3/8 in. (9.5 mm) I.D.
ar
5-23
