TM 5-3610-285-14
g.
Remove tape from bolt connectors; then tag and disconnect defective power cord wires.
h.
Pull defective power cord from junction box.
i.
Install new power cord into junction box and, using thin wall cable clamp, attach power cord to junction
box.
j.
Connect wires to bolt connectors and retape connectors.
k.
Connect chassis ground wire.
l.
Reinstall junction box.
m.
Reinstall power cord cable clamp.
n.
Reinstall blowers/heater housing front cover panel.
o.
Plug in power cord.
3-17. PREPARATION FOR STORAGE OR SHIPMENT . Contact your battalion for packing and shipping instructions.
Section V. DIRECT/GENERAL SUPPORT MAINTENANCE
There are no direct/general support maintenance procedures assigned for this equipment.
3-34/(3-35 blank)