TM 5-3610-257-14
Table 6-3. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B- Before
W- Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
IN
ITEM TER
ITEM TO BE INSPECTED
NO.
VAL
PROCEDURES
FILM DRYER - Cont
1
S
Service Film Dryer - Cont
20.
Reinstall three gears on upper roller assembly.
21.
Reinstall guide rods.
22.
Install ty-belts if necessary.
23.
Replace filter.
24.
Remove air pump bracket and air pumps by pulling upward.
25.
Disconnect air pump electrical connections.
26.
Remove screws and air pumps from bracket. Inspect gaskets and replace if necessary.
27.
Clean air pumps so they are free of dust and dirt.
Reinstall air pumps to bracket and reinstall assembly in cabinet.
6-22