TM 5-3610-257-14
Table 6-3. ORGANIZATIONAL PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B- Before
W- Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
IN
ITEM TER
ITEM TO BE INSPECTED
NO.
VAL
PROCEDURES
FILM DRYER - Cont
1
S
Your machine may be equipped with a slot key
that will allow removal of air tubes from
right side (gear side) station. Carefully
check your configuration.
12.
Remove buffer rings and air tube corks. Visually inspect and replace if worn or damaged.
13.
Cut ty-belts and discard.
Service Film Dryer - Cont
14.
Wash rollers, buffer rings, and drip tray with water and mild detergent. Rinse thoroughly.
15.
Reinstall air tubes and rubber grommets in left side stations (top and bottom).
16.
Reinstall nylon bearings and rollers into right side (gear side) and left side stations (top and
bottom).
NOTE
Rubber doughnuts of front conveyor rollers are closer to gear end than rear set.
17.
Install buffer rings on each front air tube.
18.
Position buffer rings to left of every other doughnut on front roller.
19.
Reinstall five gears and two brass washer on bottom right side station.
6-21