TM 5-3610-257-14
Table 6-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B- Before
W- Weekly
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
IN
FOR READINESS
ITEM TER
ITEM TO BE INSPECTED
REPORTING
NO.
VAL
PROCEDURES
EQUIPMENT IS
NOT READY /
AVAILABLE IF:
FILM DRYER - Cont
2
D
Test.
1.
Check control unit assembly for damaged knobs or
switches.
(a) Turn on film dryer. Check for roller rotation
and airflow.
(b) Adjust MOTOR SPEED control from slow to
Speed does
fast. Observe roller speed changes.
not change.
(c) Move FWD/REV switch to REV position.
Observe roller direction changes.
2.
Dry several film and inspect each for signs of pulling, Prints are
stretching, spotting, streaking, or distortion of image. torn or
Check for rips and tears. distorted.
6-10