TM 5-3610-257-14
5-6.
OPERATION UNDER USUAL CONDITIONS.
5-6.1.
Operating Procedures.
a.
Starting Unit.
(1)
Plug in power cord.
CAUTION
Do not turn S19 WATER PUMP switch on unless water is in sink, or recycling pump will burn out.
(2)
Fill sink with water to proper level.
(3)
Turn on POWER, SINK, CABINET, and S19 WATER PUMP switches.
(4)
Place processing trays in sink and add processing chemicals.
(5)
Run unit for approximately 15 min to allow chemical temperature to stabilize.
b.
Shutting Unit Down.
(1)
Turn POWER, SINK, CABINET, and S19 WATER PUMP switches off.
CAUTION
Prior to disposal of developer and fixer, field users should contact their local environmental
coordinator or their local industrial hygienist for instructions on proper disposal of chemicals.
(2)
Place container, if required, under drain on outside of section and remove drain cap.
(3)
Dispose of used chemicals into dump trough at rear of sink and remove trays.
(4)
Rinse trays and flush trough.
(5)
Remove drain plug and drain sink.
(6)
Reinstall outside drain cap.
5-6.2.
Preparation for Movement.
a.
Drain storage tank as follows:
(1)
Turn off storage tank heater switch.
5-16