TM 5-3610-253-14
Table 6-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weeklv
AN - Annually
(Number) - Hundreds of Hours
D - During
M - Monthly
S
- Semiannually
ITEM
NO.
1
B
Q - Quarterly
BI
- Biennially
ITEM TO BE INSPECTED
PROCEDURE
SHRINK WRAP SYSTEM - Cont
4.
Plug in power cord.
Turn control switch to
COLD for-30 seconds.
5.
Turn control switch to HOT.
flow control to change heat
CAUTION
Adjust air intake
level.
Failure to turn control switch to cold for
at least 1 minute after operating heating
element can damage heat gun or cause pre-
mature failure.
6.
Turn control switch to COLD for 1 minute.
For Readiness
Reporting,
Equipment Is
Not Ready]
Available If:
Heat gun
does not
heat.
6-6