TM 5-3610-253-14Table 6-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - ContB - BeforeW - WeeklvAN - Annually(Number) - Hundreds of HoursD - DuringM - MonthlyS- SemiannuallyITEMNO.1BQ - QuarterlyBI- BienniallyITEM TO BE INSPECTEDPROCEDURESHRINK WRAP SYSTEM - Cont4.Plug in power cord.Turn control switch toCOLD for-30 seconds.5.Turn control switch to HOT.flow control to change heatCAUTIONAdjust air intakelevel.Failure to turn control switch to “cold” forat least 1 minute after operating heatingelement can damage heat gun or cause pre-mature failure.6.Turn control switch to COLD for 1 minute.For ReadinessReporting,Equipment IsNot Ready]Available If:Heat gundoes notheat.6-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business