TM 5-3610-253-14
Table 5-4. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
(Number) - Hundreds of Hours
AN - Annually
W - Weekly
B - Before
s - Semiannually
M - Monthly
D - During
BI-Biennially
A - After
Q - Quarterly
For Readiness
ITEM TO BE INSPECTED
Reporting,
IN-
ITEM
Equipment Is
TER-
PROCEDURE
NO.
Not Ready/
VAL
Available If:
PAPER CUTTER - Cont
Check Light Barrier.
B
6
1. Turn on power.
(a) Unlock safety lock with operator key.
(b) Turn main power switch to I position.
(c) Press control power on switch.
2. Check that signal lamp on right light barrier
housing is on.
Signal
3. Cover each emitter lamp individually and make
lamp does
sure signal lamp goes off.
not go off.
5-43