TM 5-6675-330-12&P
SECTION II
INITIAL INSPECTION
Mechanical Check
I
NOTE:
Upon receipt of the SEDME-MR, a complete
mechanical inspection should be made.
I
Check to make certain that all components of end
items are included in the carrying cases. (See
Figures 1, 2, 3].
Examine the lenses and prisms to make certain that
they are clean and undamaged.
Operate the OFFSET and the PPM switches and check
for smoothness of operation.
Performance Check
To verify that the instrument is operating properly,
make a performance check after completing the
mechanical inspection. Set up the instrument on a
known base line, make at least three measurements,
and compare the mean of the displayed range
readouts with the known range. (Page 18).
b
If the instrument operates incorrectly, consult the
OPERATING NOTES and the MAINTENANCE section.
If additional corrective action is required, return
instrument to appropriate repair facility.
Repacking For Shipment
1. A failed distance meter must be returned in its
case for repair.
NOTE:
The carrying case is not a shipping container,
Ensure that the carrying case is packaged
adequately for commercial shipment to prevent
damage.
2. Attach exchange tag to the instrument specifying
the organization that presently operates/maintains the
SEDME-MR and a brief description of the problem. All ,
tags should identify the instrument by its serial
number.
10