TM 5-6675-328-14
Table 5-1. OPERATOR PREVENTIVE MAINTENANCE CHECKS AND SERVICES - Cont
B - Before
W - Weekly
AN - Annually
(Number)
-
Hundreds
of
Hours
D - During
M - Monthly
S - Semiannually
A - After
Q - Quarterly
BI - Biennially
ITEM TO BE INSPECTED
For Readiness
ITEM
IN-
Reporting,
NO.
TER-
Equipment Is
VAL
PROCEDURE
Not Ready/
Available If:
INSTRUMENT LATHE - Cont
2
A
Service Lathe - Cont
3. Check spindles for damage. Clean chips from surfaces and collet
recesses.
4. Check chip tray for accumulated chips. Clean chips from tray with
cheesecloth.
5. Inspect headstock spindle lock for proper operation.
6. Inspect chip screen for residue and clean with cheesecloth.
3
M
Inspect and Test Controller.
5-12