TM5-6675-326-14
1-10.4 Replace Main Power Fuse
PERSONNEL REQUIRED:
1 Terrain analyst M3S 81Q
MATERIALS/PARTS:
Fuse (BUSS 250 v AGC1)
REMOVAL:
a.
b.
INSTALLATION:
a.
b.
WARNING
ELECTRICAL SHOCK
Turn off main circuit breaker before
r e p l a c i n g f u s e .
Failure to do so may
r e s u l t i n d e a t h o r s e r i o u s i n j u r y.
Push in on fuse cap.
Turn fuse cap to left and remove.
Remove defective fuse from fuse cap.
Install new fuse into fuse cap.
Reinstall fuse cap .
Turn to right to lock in place.
Section IV.
ORGANIZATIONAL MAINTENANCE
1-11 REPAIR PARTS; SPECIAL TEST; TEST, MEASUREMENT, AND DIAGNOSTIC
EQUIPMENT (TMDE); AND SUPPORT EQUIPMENT.
1-11.1 For authorized common tools and equipment, refer to the Modified
Table of Organization and Equipment (MTOE) applicable to your unit.
1-34